Building a Deck in the Kawartha Lakes: From Permit to First BBQ

A deck is the most-used ‘room’ of a cottage summer — and the project where skipping steps costs the most later. Here is the order things actually happen in, and who does each part.

Step by step

  1. Design and size. Decide what the deck is for — dining, dock access, a hot tub (which changes the structure completely) — and sketch it before anyone quotes.
  2. Permit. Most decks need a building permit from your township, and waterfront lots can have setback and lot-coverage rules. Your contractor or designer usually prepares the drawings; the permit is the owner’s responsibility to have in hand before digging.
  3. Footings. Footings must reach below the frost line — in this part of Ontario that is deeper than most people guess, and rock can mean engineered alternatives. This is excavation work, not hand-digging.
  4. Frame and structure. Ledger attachment to the house, beam and joist sizing, and hardware are where inspections focus — and where cheap builds cut corners.
  5. Decking and railings. Pressure-treated is the baseline; composite costs more and asks less of you every year after. Railings are a code item, not a style choice, once the deck is above grade.
  6. Stairs, skirting and finishing. Stairs to grade, skirting that keeps critters out, and a stain or sealant plan for wood decks.

What to ask before you sign

  • Does the quote include the permit drawings and inspections?
  • What footing system are you using on my lot, and why?
  • Is the hot tub (if any) engineered into the structure?
  • What is the warranty on workmanship?